Detail Stock
Log Stock
Showing 1-9 of 9 items.
Log Stock Barang
| # | Tanggal | Stock Sebelum | Jumlah | Jumlah Stock | Keterangan Stock | Kode Stock | Jenis Stock | Perubahan | Dibuat Oleh |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 27-02-2026 10:24 | 0 Sets | 2 Sets | 2 Sets | PEMBELIAN PC0000001231 | S1231 | MASUK | SISTEM | ATIKA |
| 2 | 31-01-2026 16:08 | 0 Sets | 4 Sets | 4 Sets | PEMBELIAN PC0000001215 | S1215 | MASUK | SISTEM | ATIKA |
| 3 | 31-12-2025 14:10 | 0 Sets | 3 Sets | 3 Sets | PEMBELIAN PC0000001207 | S1207 | MASUK | SISTEM | ATIKA |
| 4 | 09-12-2025 11:38 | 2 Sets | 1 Sets | 1 Sets | PENJUALAN BARANG INV/2025/11/10006950 | S1149 | KELUAR | SISTEM | ATIKA |
| 5 | 09-12-2025 10:14 | 3 Sets | 1 Sets | 2 Sets | PENJUALAN PRODUKSI INV/2025/10/10006770 | S1149 | KELUAR | SISTEM | ATIKA |
| 6 | 09-12-2025 09:58 | 1 Sets | 1 Sets | 0 Sets | PENJUALAN PRODUKSI INV/2025/11/10006912 | SM2081 | KELUAR | SISTEM | ATIKA |
| 7 | 30-10-2025 15:58 | 0 Sets | 3 Sets | 3 Sets | PEMBELIAN PC0000001149 | S1149 | MASUK | SISTEM | ATIKA |
| 8 | 13-06-2025 14:57 | 2 Sets | 1 Sets | 1 Sets | PENJUALAN PRODUKSI INV/2024/11/10005256 | SM2081 | KELUAR | SISTEM | ATIKA |
| 9 | 13-06-2025 14:56 | 0 Sets | 2 Sets | 2 Sets | stock manual MANUAL STOCK #2081 | SM2081 | MASUK | MANUAL | ATIKA |
Log Harga
Showing 1-4 of 4 items.
Log Harga Barang
| # | Tanggal | Keterangan Log | Harga Bengkel | Harga Ecommerce | Harga Satuan Beli | Biaya Satuan Beli | Total Harga Satuan Beli | Dibuat oleh |
|---|---|---|---|---|---|---|---|---|
| 1 | 27-02-2026 10:24 | PEMBELIAN PC0000001231 | Rp. 850,000 | Rp. 850,000 | Rp. 600,000 | Rp. 0 | Rp. 600,000 | ATIKA |
| 2 | 31-01-2026 16:08 | PEMBELIAN PC0000001215 | Rp. 850,000 | Rp. 850,000 | Rp. 600,000 | Rp. 0 | Rp. 600,000 | ATIKA |
| 3 | 31-12-2025 14:10 | PEMBELIAN PC0000001207 | Rp. 850,000 | Rp. 850,000 | Rp. 600,000 | Rp. 0 | Rp. 600,000 | ATIKA |
| 4 | 30-10-2025 15:58 | PEMBELIAN PC0000001149 | Rp. 850,000 | Rp. 850,000 | Rp. 575,000 | Rp. 0 | Rp. 575,000 | ATIKA |